Had to make a trip to W M for a......pencil sharpener.

The little plastic one ended up getting broke by dh. I bought another plastic one for me. The choices for dh were battery operated, electric or manual with a suction handle. I settled for the manual. Then I went to H D for another box (20 tiles) of the decorative 6 inch tiles we are using. I have not turned the clocks forward. Dh started late on tiling and I decided to let him finish, not by the clock but the end of the job.

We will see how that works! It looks so nice. Dh has tiled 3 times as much this weekend as last. The more he does, the faster he is getting, but it is still slower than we thought it would be.
Since it has taken so much longer than we imagined, I was not going to mention doing the main bath. I was thinking he wouldn't want to do it, once the weather warms up. He doesn't want to quit until both are done. The main bath is the weirdest shape ever. You step up a 6 inch step with a narrow doorway (without a door) to the area where the bathtub is. Dh has decided rather than strip the whole bathroom to the bones like he did on the master, he will do the bathtub area first. We can hang something over the doorway while he is doing it. That way the rest of the bathroom will still be useable, since we have found out just how long this process takes.
We had about an inch of snow overnight. It is mid 30's, sunny and very windy. We're suppose to be in the high 60's to low 70's, by the end of the week.
Harriet, I hope you and dd14 have a nice time at the shower.
Harmony, hope you feel better soon.
Nancy, I enjoy hearing about the chickens.
Twins, that's a lot of hours so early in the month.
I better get busy. I feel guilty just setting while dh is working so hard.